Small Machine Tamping of the Track

The MSP small machine tamper and Minima 2 GKR (Plasser & Theurer) for precise correction of track direction and level where heavy machinery can't reach – tram lines, sidings, tight curves and grooved rail.

  • Capacity: GEOKOD Rail currently operates 4 tamping units – we cover a wide range of tamping work, including switches
  • Output: up to 250 m of tamped track per callout

Technology – Two Machines, One Control System

MSP – Small Machine Tamper

  • Character: lightweight, simple and versatile
  • Units: two independent units, each with four tamping tools
  • Jack: for lining and lifting the track
  • Gauges: 760, 1000, 1435 mm
  • Rail: standard and grooved
  • Output: up to 250 m / callout
  • Guidance: RailSURV MSP control system
  • Curves: works in tight curves too
  • Rerailing: 2 t lifting equipment (provided on site)

Minima 2 GKR (Plasser & Theurer)

  • Character: lightweight two-axle universal tamper
  • Units: two, each with four asynchronously operating tamping tools
  • Gauge: 1435 mm
  • Rail: standard and grooved
  • Dimensions / weight: 3.5 × 2.7 × 2.3 m / 3.5 t
  • Min. curve radius: approx. 20 m
  • Travel: hydraulic, up to 20 km/h
  • Guidance: RailSURV MSP control system
  • Transport: by truck

RailSURV MSP Control System

Track direction and level are controlled by our own in-house developed RailSURV MSP control system.

  • Online control of deviations from the designed track axis position
  • Ability to create transition ramps on site as needed
  • No additional surveying guidance is needed on site
  • Thanks to the RailSURV MSP system, a machine originally intended for auxiliary work has become capable of precisely adjusting track level and direction to meet even the strictest requirements

Work Procedure – at Least Two Tamping Passes

  • Tamping speed: depends on the rail-laying method and the required lift and lining
  • Note: the stated outputs are indicative and apply to a prepared site with continuous ballasting
  • Phase 0 – Directional adjustment: rough alignment of track direction before actual tamping. SK ±50 mm: 500 m/h, SK > ±100 mm: 200 m/h.
  • Phase 1 – Rough tamping: direction SK ±10 mm, level VK +10 to 20 mm below design level. VK +50 mm: 50 m/h, VK > +50 mm: 2× Phase 1.
  • Phase 2 – Final tamping: direction SK ±3 mm, level VK ±3 mm – final track geometry. Speed up to 100 m/h.
  • 10 mm – minimum level lift (except run-off sections)
  • 50 mm – maximum level lift per pass
  • 20 mm – optimal directional shift of the track during tamping

Deployment Conditions

  • Crew: the machine always comes with an experienced crew
  • Transport: we arrange transport to and from the site ourselves – the whole set-up leaves Ostrava by truck or on a trailer towed by a pickup

We provide:

  • The MSP or Minima 2 GKR machine
  • Guidance via the RailSURV MSP system without additional surveying

To be provided by the client on site:

  • Lifting equipment (2 tonnes) for rerailing and removing the MSP
  • Ballasting for tamping purposes
  • Site readiness – the work follows on from other activities

We can arrange separately on request:

  • Track-axis design work
  • Establishing a survey control network
  • Night work

Operating the Machine Requires an Experienced Crew.

Without a qualified crew, there is a risk of serious errors and devaluation of the completed work. That's why we never rent out the machine on its own – always together with our crew.

Need Your Track Tamped?

Send us the location, section length, gauge and desired date. We'll get back to you with a proposed procedure and a quote.

← Back to Services

KDYŽ ZA TECHNOLOGIÍ STOJÍ ROKY PRÁCE,
A KDYŽ JE HRANICE PŘEKROČENA,
JE ČAS UVÉST FAKTA NA PRAVOU MÍRU.

V souvislosti s prezentacemi produktu GG-05 na výstavách INTERGEO 2026 v Mnichově a InnoTrans 2026 v Berlíně a informacemi, které se v poslední době objevují mezi zákazníky a odbornou veřejností, považujeme za důležité vydat následující prohlášení.

Vývoj kolejových měřicích systémů řady APK a následně GG probíhá kontinuálně už více než dvě dekády – od roku 2003.

Autor produktu – Ing. Milan Talácko, PhD., je po celou dobu tohoto období hlavním tvůrcem a nositelem vývoje softwaru, firmwaru a technických řešení, na kterých stojí produkty využívané desítkami zákazníků na Slovensku, v České republice i v zahraničí.

Vývoj kontinuálně pokračuje.

Dnes tým GEOKOD Rail pod vedením Ing. Milana Talácka dále vyvíjí, vyrábí a poskytuje odbornou podporu systémům GG-05 VBP a TM3000. Našim zákazníkům zajišťujeme nejen technologie, ale i školení, servis a technickou podporu.

Práce, kterou jsme budovali více než dvě desetiletí, má svá autorská práva, své tvůrce a svou historii.

Proto nemůžeme ignorovat prezentace, materiály a vyjádření, které podle našeho názoru obsahují nepravdivé, zavádějící nebo sporné informace a mohou zasahovat do dobrého jména společnosti GEOKOD Rail či do autorských práv Ing. Milana Talácka.

Situaci prověřujeme a podnikáme kroky na ochranu svých práv.

Nadále však zůstáváme soustředěni především na to, co umíme nejlépe: vyvíjet, vyrábět, podporovat naše zákazníky a posouvat technologie dopředu.

Férově. Odborně. Transparentně.

GEOKOD Rail s.r.o.
Ing. Milan Talácko, PhD.
Ing. Miroslav Konečný
statutární zástupci